Incident one

Workers at a quarry were screening and crushing aggregate using a tracked screening plant and secondary mobile cone plant. It was nearing the end of the day when the screening plant screwed around on its tracks making contact with the secondary cone. The operator thought that he had accidentally activated the remote control unit. The plant was moved to another location where it screwed on its tracks for a second time. Because the remote was controlled by a different operator, workers realised that there must be a fault with the remote. The plant was then shut down and isolated to prevent further unintended movement.

The following factors were reported by staff:

  1. The machine had been working all day.
  2. The machine remote was flat that morning.
  3. Thunderstorms were reported for previous days.
  4. There were different staff members for both occasions of the malfunction.
  5. Both staff saw the plant operational light flash when unwanted tracking occurred.

Investigation

The supplier and servicing agent were contacted and an assessment of the machine was carried out.

The issue was identified as an electrical failure of the remote due to water getting into it. Small tears in the overlay of the remote are the likely cause of the ingress. The remote was IP66 rated to prevent ingress of dust and water, when the remote is maintained in good condition.

All other components on the plant were in good condition.

[image] An old, worn-out yellow and black remote control device with icons on the buttons

FIGURE 1: Remote control showing tears in the overlay

Incident two

Live maintenance testing was being performed on a continuous miner machine (CM01) in the mechanical workshop. At the same time, an operator was taking a remote from a charging station for a different continuous miner (CM03) in preparation to be taken underground for use.

The office where the charging station is located is approximately 250 m from the workshop. While the operator was fiddling with the CM03 controls in the office, the CM01 in the workshop started to operate.

Investigation

The remotes were found to be operating on the same frequency. Following the incident, the two machines were put on different frequencies and a charging procedure was developed.

[image] Circuit board with water on the components

FIGURE 2: Remote housing showing water ingress

Key learnings and recommendations from these incidents

  • Perform a risk assessment of electrical equipment such as remotes used on site to ascertain and plan for what can go wrong.
  • Identify no-go zones through a robust risk assessment process, communicate these to the workforce, including when the equipment is operated via remote control.
  • Check all electrical equipment regularly, tagging out any defective equipment either replacing it or sending for repair.
  • Ensure each asset operated by remote control operates on different frequencies to prevent interference.
  • Visually check all remotes for damage regularly, and send for full assessment by a competent person on a six-monthly basis, or as reasonably practicable.
  • Store all remotes not in use in sealed, clear, protective containers to prevent damage and ingress of dust or water.
  • Develop a remote charging procedure.
  • Where possible install an isolation switch on plant to prevent movement unless switch is engaged.
  • If multiple on-site assets use remote controls, label remotes against the respective assets they are intended to be operated with.
  • Hold regular toolbox meetings with workers to discuss safety issues and highlight importance of treating remotes as a sensitive device.
  • The remote control should be submitted to the effect of impact test in accordance with the appropriate standard such as AS/NZS 4240.1: Remote control systems for mining equipment – Design, construction, testing, installation and commissioning.

The remote control should be capable of withstanding a free vertical fall of one metre onto a rigid surface without causing hazardous motion, inadvertent starting or rendered stop control inoperable.

The remote control should incorporate a remote shutdown device that is both accessible and prominent for use in emergency to ensure a safe stopping in the event of a malfunction.

Actuating1 controls should be suitably shrouded or otherwise designed so that likelihood of them being operated unintentionally is minimised to as low as possible. All controls should be a deadman control type2.

External interference, such as electromagnetic, to the remote control should not cause a dangerous condition.

 Footnotes

1 An actuator is a component of a machine that is responsible for moving and controlling a mechanism or system

2 A control that is physically maintained by the operator and when released the controlled function stops.


» Read original article here



OUR COMMENTS:


DID YOU KNOW?

The latest estimate for failure to adequately address safety concerns globally has been put at 3.9% of the global GDP.  In dollar terms that is US$2.99 Trillion.

David Buchanan
Buchanan Painting and Waterblasting
Jim Pope from Hauraki Health and Safety has done what he said he would do. I can now focus on building my business knowing that Jim has my back. He manages my safety for me, is dealing with my pre-qualification (which I found confusing) and he has given me an app to use which means no paper, no worries and no having to work after hours on safety stuff. It really is nice knowing that I don’t have to do this because Jim is.”
Jaydene Buckley
OSACO Partners
Jim Pope from Hauraki Health and Safety has delivered project management training internationally under contract to us and we have received fantastic feedback from his course participants. We are utilising Jim’s skills in other areas of our work both here in New Zealand and internationally. We have found Jim easy to communicate with and nothing is ever a problem. Jim works with you and we appreciate his collaborative approach. His subject matter knowledge has been helpful in us being able to develop other business opportunities. We look forward to an ongoing association with Jim and Hauraki Health and Safety.

Sign up for our Newsletter

We will publish regular updates and advice about safety & HR as well as the latest safety & employment relations news and what this means for you.